PROJECT LIST

Item Project name Value (USD) Client Start   Completion Field Locations
                 
                 
62 Ablution Units Supply & Rehabilitation 879,000 PAE / US DoS 01/06/2018   Ongoing Construction BDSC, Baghdad
61 2 x 280,000 Gallon CST Tanks 523,000 PAE / US DoS 01/11/2017   Ongoing Supply & Installation BDSC, Baghdad
60 Roads Survey & Design 99,000 US Department of State 01/09/2018   Ongoing Survey BDSC, Baghdad
59 Airfield Repairs to Ramp Area 167,000 PAE / US DoS 01/10/2018   01/03/2019 Construction BDSC, Baghdad
58 West End Power Plant 12 x Generators 141,500 PAE / US DoS 01/02/2017   01/05/2017 Supply & Installation US Embassy, Baghdad
57 EHP Firehouse Generators Install 61,000 PAE / US DoS 01/05/2017   01/04/2018 Installation US Embassy, Baghdad
56 Residential Comlex for SOMO  41,000,000 Iraqi Ministry of Oil 10/09/2018   Ongoing Construction Baghdad
55 Supply 2 x 2MVA Caterpillar Generators 1,500,000 Iraqi Ministry of Oil 15/11/2015   01/11/2016 Supply & Installation Baghdad
54 Supply of 900 tons Toluene 1,500,000 Iraqi Ministry of Oil 29/01/2015   01/11/2016 Supply Baghdad
53 Petroleum Research and Development HQ  10,000,000 Iraqi Ministry of Oil 07/10/2013   17/03/2019 Construction Baghdad
52 SOMO Infrastructure Project 10,000,000 Iraqi Ministry of Oil 07/11/2012   24/04/2014 Infrastructure Baghdad
51 Taji Air Trafic Tower 9,807,000 US Corps of Engineers 27/03/2010   01/06/2011 Construction Taji Base
50 Fuel farm 6,500,000 US Corps of Engineers 20/11/2009   30/11/2011 Oil & Gas Taji Base
49 JRPC warehouses 21,498,500 US Corps of Engineers 02/11/2009   20/07/2011 Construction Taji Base
48 Squadron Simulator Blg. 1,243,000 US Corps of Engineers 28/10/2009   31/12/2010 Construction Taji Base
47 LATI 3,490,500 US Corps of Engineers 25/10/2009   11/04/2011 Construction Taji Base
46  Mi17 Hanger 9,807,000 US Corps of Engineers 16/08/2009   31/12/2010 Construction Taji Base
45 IMAR, Rustamiyah 2,871,000 US Corps of Engineers 15/06/2009   09/02/2010 Construction Rustamaya, Baghdad
44 Aerospace project 1,468,500 US Corps of Engineers 19/03/2009   15/10/2009 Construction Taji Base
43 EISP 2,248,000 US Corps of Engineers 03/01/2009   02/05/2009 Construction Taji Base
42 CSU Permanent Dormitories 5,500,500 US Corps of Engineers 22/10/2008   15/10/2009 Construction Taji Base
41 600 Man Berthing Facilities 1,409,500 US Corps of Engineers 22/10/2008   15/02/2009 Construction Taji Base
40 AMC Building 691 488,500 US Corps of Engineers 25/10/2008   22/05/2009 Construction Taji Base
39 Sector-3&4 Warehouses 1,288,500 US Corps of Engineers 06/11/2008   15/10/2009 Construction Taji Base
38 Location Command Phase-IV 1,607,500 US Corps of Engineers 06/11/2008   27/12/2009 Construction Taji Base
37 Vehicle Wash River Connection 148,000 US Corps of Engineers 24/10/2008   21/01/2009 Water Taji Base
36 Location Command Phase - III 1,958,500 US Corps of Engineers 06/11/2008   10/12/2009 Construction Taji Base
35 IASSI Kitchem Electrical Upgrade 82,000 US Corps of Engineers 24/10/2008   22/11/2008 Construction Taji Base
34 CAFFT Avionics 931,500 US Corps of Engineers 16/09/2008   13/01/2009 Construction Taji Base
33 Location Command, Phase II 10,321,000 US Corps of Engineers 16/09/2008   13/05/2009 Construction Taji Base
32 North Staging Yard Improvement 408,500 US Corps of Engineers 21/07/2008   03/10/2008 Construction Taji Base
31 Miscellaneous Repairs N & S Depot 1,733,500 US Corps of Engineers 28/07/2008   24/11/2008 Construction Taji Base
30 Location Command, Phase I 8,154,000 US Corps of Engineers 30/06/2008   29/04/2009 Construction Taji Base
29 IASSI Kitchen Trainning 290,000 US Corps of Engineers 30/06/2008   27/09/2008 Construction Taji Base
28 RTC Phase-II 3,696,000 US Corps of Engineers 04/05/2008   04/01/2009 Construction Taji Base
27 RTC Phase-I 3,126,500 US Corps of Engineers 04/05/2008   10/02/2009 Construction Taji Base
26 MTF 2,302,500 US Corps of Engineers 04/05/2008   30/11/2008 Construction Taji Base
25 Sector 6 & 7 5,392,500 US Corps of Engineers 02/04/2008   27/03/2009 Construction Taji Base
24 Sector-9 Warehouses. 1,753,000 US Corps of Engineers 07/02/2008   04/08/2008 Construction Taji Base
23 North Depot Induction facility 502,000 US Corps of Engineers 03/02/2008   01/06/2008 Construction Taji Base
22 N & S Depot Water Network 654,500 US Corps of Engineers 07/02/2008   04/08/2008 Water Taji Base
21 N & S Depot Sewers repair 740,500 US Corps of Engineers 07/02/2008   04/08/2008 Sewers Taji Base
20 CMATT Road repair 498,000 US Corps of Engineers 20/01/2008   18/04/2008 Construction Taji Base
19 Sector 8 Renovation 2,119,500 US Corps of Engineers 20/01/2008   17/07/2008 Construction Taji Base
18 TND Electrical upgrade 3,695,000 US Corps of Engineers 14/01/2008   03/12/2008 Power Taji Base
17 Paint facility Bld. 3092  483,000 US Corps of Engineers 16/12/2007   13/04/2006 Construction Taji Base
16 Refurbishment Buildings 13075 to 13083 492,500 US Corps of Engineers 19/11/2007   16/05/2008 Construction Taji Base
15 Equipment Supply  556,500 US Corps of Engineers 24/11/2007   23/12/2008 Construction Taji Base
14 Transmission Facility 118,500 US Corps of Engineers 19/11/2007   17/03/2008 Construction Taji Base
13 Blast facility  967,000 US Corps of Engineers 19/10/2007   16/03/2008 Construction Taji Base
12 ECP-14 Camp Victory T-Walls 1,362,000 US Corps of Engineers 15/12/2007   23/06/2008 Construction Camp Victory
11 9th Division Base 18,167,500 US Corps of Engineers 26/10/2007   20/01/2009 Construction Taji Base
10 3 x 1.5M Generators Janain Pump Station 1,351,000 US Corps of Engineers 14/09/2007   10/07/2008 Power Baghdad
9 TND LSA Referbishment 2,325,500 US Corps of Engineers 06/05/2007   17/07/2008 Construction Taji Base
8 M413 Kadamiya  Potable Water Network 1,423,000 US Corps of Engineers 17/10/2007   25/12/2008 Water Kadamaya
7 Electrical work LogBat 1,039,500 US Corps of Engineers 30/06/2007   15/04/2009 Power Taji Base
6 10 New Buildings LogBat 3,017,000 US Corps of Engineers 30/06/2007   09/08/2008 Construction Taji Base
5 Salman Pack 5 x WCU 331,000 US Corps of Engineers 19/07/2007   25/09/2007 Water Salman Pack
4 Overlay Roads M636 4,081,000 US Corps of Engineers 14/01/2007   08/11/2008 Construction Baghdad
3 Overlay Roads M634 3,051,500 US Corps of Engineers 14/01/2007   29/10/2008 Construction Baghdad
2 Al-Madain Primary Health Clinic 858,500 US Corps of Engineers 17/09/2006   13/03/2008 Construction Al-Madain
1 Repair 8 x 400kV OHL 1,312,500 US Corps of Engineers 23/12/2006   15/03/2007 Power Baghdad South

 